Show summary tasks in resource's 'Work' section in PWA

$
0
0

Is there any default way to show the summary tasks in the resources My Work->Tasks section?

 

I've avoided assigning summary tasks to resources but it would be really useful for resources to see the summary tasks as they enter updates.

 

Please let me know.

Thank you,
Damon Curtin


Serious Poblems with Server

$
0
0

Hi I m facing a scenario in our production environment when the timesheet page, resources page, projects page goes go web part maintenance dialogue. This happens only sometime about once in 2 weeks but I cant find the reason. After rebooting the application server the pages load properly.

This is what I see in logs:

1. AssemblyReflector : Failed to load dependency assembly in load context and in load from context. Assembly: BihConsumerInterop System.IO.FileNotFoundException: Unable to find the specified file

2. SPReaderWriterLock named [Process Context Lock] held for 109 milliseconds. Call stack: (enable Verbose for stack trace)

3. DependencyInjectionHandler : API documented invariant broken. Properties are not set even though the exposer is exposed.

4. Unexpected Exception in SPDistributedCachePointerWrapper::InitializeDataCacheFactory for usage 'DistributedLogonTokenCache' - Exception 'Microsoft.ApplicationServer.Caching.DataCacheException: ErrorCode<ERRCA0018>:SubStatus<ES0001>:The request timed out

5. CCANameProjector : Exception:Exception : Access to the path 'E:\SPData\Office Server\CanonicalResources\ProjectionModels\EN_EN.mdl' is denied.

6. Failed to Sql Query data XEvent collector on _____\ProjServer with error User does not have permission to perform this action.

Please hlp



Cannot edit / modify enterprise resources with Project pro

$
0
0

Hi all,

We have a strange behavior while trying to edit / modifiy a resource with Project Pro. In fact, we are not able to do any modifications on resources in Project Pro.

The administrator opens the Resources Center in PWA, select a resource and can edit it in PWA. But he needs to modify the rates (table B, C, D and E), so he must use Project Pro. He then click Edit in Project Pro. Project opens and the resource is displayed correctly. The administrator does all the required modifications and click the save button. So far so good.

But when he tries to close Project Pro, a dialog ask him if he wants to save the modifications. Of cours he answers "Yes". Nothing happens, Project Pro doesn't close. To close Project Pro, he must answer "No". Project Pro closes, but no update have been done to the resource, all modifications have been lost.

I don't think a permission problem since he can edit or modifiy the resource in PWA. We have also tried to do the same on another computer or with another user. Same result.

Does someone has experienced the same behavior ? Or knows how to fix it ?

Thanks in advance

Hugues


Hugues Perron

Can I use same HOSTNAME and IP if I demote a RODC 2008r2 to 2012r2 RODC in same domain.

$
0
0

Hi Gets and Ladies,

I have a scenario hear that im upgrading our RODC 2008r2 to 2012r2 RODC.

Can I use same HOSTNAME and IP in same domain forest?.

hope you could guide me to the right Technet documentation or a good article to follow that support this kind of migration.

By the way I'm following the best practice that doing this from a clean setup not a upgrade.

Thank you in advance.

Best Regards

Rhyan Ablan

SQL Project Server Calendars Tables

$
0
0
Where calendars are store inside sql database? I mean holidays (exceptions) and working weeks entries?

DB Schema Issue - DB Master on sql server instance ProjectServer is not empty

$
0
0

Hi, We are facing an error on our server which says "DB Master on sql server instance ProjectServer is not empty and does not match the current database schema."

Any Help greatly appreciated.

Engagement tab not visisble in 'MS Project Pro for Office 365' after activating the new Resource Engagement feature

$
0
0

A few days ago, I activated the 'New Resource Management Features Available' option in Project Online via 'Server Settings > 'Additional Server Settings'.

However, the 'Engagement' tab in 'MS Project Pro for Office 365' is not visible. How do I activate this feature in 'MS Project Pro for Office 365' ?

'MS Project Pro for Office 365' is up to date.


\Spiro Theopoulos, Montreal, QC (Canada)

Problem with opening some docs on Project sites

$
0
0

Hi All, we have a couple of users facing a problem with opening a number of office docs.

Any Help greatly appreciated


Project Server 2013 Files Not Saving

$
0
0

We have new users to Project Server 2013 that are complaining that they do periodic saves and the next time they re-open their file their changes are not there.  Sounds like an issue of changes not transferring from cache.

Has anybody else seen this?

Regards,

Chris

Earned Value Fields Project Server Online

$
0
0

Hello, 

I just want to create in Project Server Online an earned value report containing:  Planned Value - PV (BCWS)Earned Value - EV (BCWP)CVCV%CPIBACEACVACTCPI this fields are available in project server online tables?










Can somebody tel me what to do?


marylu

Users see some Projects when not in the same RBS as Owner

$
0
0

I am trying to utilize RBS in MSPS 2013 On Prem to manage what users have access to.  I believe I have it set-up almost correctly, there is one issue that I cannot seem to resolve. The issue only occurs when I use the "The Project Owner has the Same RBS value as the user" (the 5th check box in the Category set-up)

I have two RBS values in the RBS Table, for this blog call them RBS-A and RBS-B.

Problem:  User A when in RBS-A  can still see "some" of the projects where the owner is in RBS-B.  When I say some, the RBS-B owner has 10 projects,  User A will see 4 projects. 

  • User A is not a resource on      any of the 10 projects
  • All 10 projects have the same      owner
  • Have published all the      projects, a few times
  • If I add User C, D & E to      RBS-A, they see the same 4 projects and again they are not a resource on      the 4 projects
  • I have tested all the RBS      options (the 5 check boxes) in the Category set-up. I get the results expected when I      check/uncheck each of the check boxes except for the 5th one
  • We are not using the Team      Assignment feature
  • If I move User A to RBS-B he      sees all 10 Projects and none of the projects where the Owner is in RBS-A      (As expected result)
  • User A only has the one      Category in their Permission Group

There is some link/issue/association to the 4 projects that I cannot figure out. 

Any ideas

Andrew Payze


Andrew Payze

Publish control in Status updates history ribbon is disabled in migrated project server 2013

$
0
0

Hi,

We have a project server 2013 that migrated from 2007.

In both 2010 and 2013 PWA site "Publish" control in Status updates history ribbon is disabled and can not publish pending approved updates.

This is the page that this problem was occurred:

http://<Server Name>/PWA/_layouts/15/PWA/Statusing/StatusApprovalsHistory.aspx

A Microsoft SharePoint Foundation compatible application could not be found

$
0
0

Hi,

I created two Excel Reports and saved them in a SharePoint 2010 folder (with the help of Andrew Lavinsky).

But when I try to edit them in Excel, I get the message:

"Message from webpage: The document could not be opened for editing".

A Microsoft SharePoint Foundation compatible application could not be found to edit the document".

How can I fix this issue?

Thanks for your help.

[MSPS 2013] Quick Launch Issue after migration from MSPS 2007

$
0
0

Hi,

I am unable to make any changes to the quick launch settings in Project Server 2013 after upgrading from Project Server 2007. When I click on the Quick Launch option from PWA Settings, the following message pops up.

Regards

Woon Woon, Gan

Project Professional Exports to Excel

$
0
0

Hi,

I am having problems when exporting project schedules using mapped fields to Excel.

I have set the project's date format to '28 January 2009' (for example), but it exports to Excel in '28 January 2009 12:33'

I desperately need to remove the HH:MM against all tasks I'm exporting in order for my spreadsheet to do its magic, please help!

Thanks.


xampp apche module not working

$
0
0

showing error

httpd.exe-Entry point not found

the procedure entry point ucrtbase.terminate could not be located in the dynamic link api-ms-win-ctr-runtime-|1-1-0.dll.

Missing Project Web App: Synchronization of AD with the Enterprise Resource Pool job

$
0
0

In Central Admin>Monitoring>Review Job definition , I can't find Project Web App: Synchronization of AD with the Enterprise Resource Pool job for <PWA Site> so I can't syn AD for my PWA

Could anybody know how to fix it?

Thank you :)

Project Server upgrade 2010 to 2013

$
0
0

Hi All,

We are upgrading our project server 2010 to 2013. While upgrading the content database it failed with the following error. How to resolve this errors.

03/01/2016 14:48:49.26powershell (0x1040)0x24F4SharePoint Foundation UpgradeSPContentDatabaseSequenceajxkzERRORDatabase [WSS_Content] contains a site (Id = [d56ca1a3-8469-494a-8a9f-2ab96fe9bcc3], Url = [/]) that is not found in the site map. Consider detach and reattach the database.f3137632-cd52-4228-91f4-63843d2d0fe9

03/01/2016 14:48:49.26powershell (0x1040)0x24F4SharePoint Foundation UpgradeSPContentDatabaseSequenceajxkzERRORDatabase [WSS_Content] contains a site (Id = [97ae557f-d831-4d02-adbf-e3e6981381b2], Url = [/PWA]) that is not found in the site map. Consider detach and reattach the database.f3137632-cd52-4228-91f4-63843d2d0fe9

03/01/2016 14:48:49.26powershell (0x1040)0x24F4SharePoint Foundation UpgradeSPContentDatabaseSequenceajxk3ERRORDatabase [WSS_Content] contains a site (Id = [d56ca1a3-8469-494a-8a9f-2ab96fe9bcc3], Url = [/]) whose url is already used by a different site, in database (Id = [b5834d66-8af6-4804-8835-43c5e4a49cc0], name = [EPM_TEST_WSS_Content_80]), in the same web application. Consider deleting one of the sites which have conflicting urls.f3137632-cd52-4228-91f4-63843d2d0fe9

03/01/2016 14:48:49.26powershell (0x1040)0x24F4SharePoint Foundation UpgradeSPContentDatabaseSequenceajxk3ERRORDatabase [WSS_Content] contains a site (Id = [97ae557f-d831-4d02-adbf-e3e6981381b2], Url = [/PWA]) whose url is already used by a different site, in database (Id = [b5834d66-8af6-4804-8835-43c5e4a49cc0], name = [WSS_Content_80]), in the same web application. Consider deleting one of the sites which have conflicting urls.f3137632-cd52-4228-91f4-63843d2d0fe9


Thanks in advance, Taj


Enable-SPFeature : The Project content database extension has not been provisioned for this content database.

$
0
0

Hello, 

after created my test farm on SP2016 and Projectserver 2016 I have a problem

PowerShell reply:

Enable-SPFeature : The Project content database extension has not been
provisioned for this content database.
At line:1 char:1
+ Enable-SPFeature pwasite -URL http://server.domain.us/PWA
+ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    + CategoryInfo          : InvalidData: (Microsoft.Share...etEnableFeature:
   SPCmdletEnableFeature) [Enable-SPFeature], SPException
    + FullyQualifiedErrorId : Microsoft.SharePoint.PowerShell.SPCmdletEnableFe
   ature

I deploy PWA  to instructions (http://myprojectexpert.com/Lists/Posts/Post.aspx?ID=78)

farm level - custom

and  I do not find  in directory c:\Program Files\Common Files\microsoft shared\Web Server Extensions\16\TEMPLATE\SQL\

no sql script   with project DB query!! 

ProjectModifiedDate is not updated in project server 2013

$
0
0

Hi

recently i update Project Server 2013  SP1 and Project Server 2013 CU Dec 2015,after update Dec CU,I am unable to get updated last modified date.Last Modyfing date (ProjectModifiedDate) showes old date.


Hasan Jamal Siddiqui(MCTS,MCPD,ITIL@V3),Sharepoint and EPM Consultant,TCS

Viewing all 4226 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>