Error: The view failed to load. Press OK to reload this view with the default...
Hello,I am receiving the above error when viewing the schedule of one specific project , i have asked our system admins to install the latest cumulative update available on :"...
View ArticleWhat is the AllItems.zip file?
Hi,I just installed a new Project Server 2010. When I click on the "Data Connections" link in the navigation pane ofBusiness Intelligence Center, the system asks me to download a "AllItems.zip" file.If...
View ArticleExpected version of the product was not found on the system. Project Server...
Hi!I am in the process of applying PS2010 SP1 and it gives me this error: "Expected version of the product was not found on the system". I already have SP2010 SP1 installed as the client already had...
View ArticlePS2010 WBS in PWA Views not showing as in Cient
I'm seeing some very strange behavior in the WBS column and wondering if others have seen this and know how to fix...Received a file whose WBS was out of sync (top level starting as 52), probably from...
View ArticleRecommended SQL Server settings for Project Server 2013
Hello, I am wondering if all the recommended SQL Server settings for Project Server 2010 (e.g. as described here...
View ArticlePWA 2013 - Physical % Complete
Hello,i would like to ask you guys a simple question: i'm trying to find out how can i edit the "Physical % Complete" field on a project task using the PWA (I'm working with Project Server 2013).Is...
View ArticleUser is in SharePoint "Project Managers" group and should not be
Hi,I am currently trying to understand what is causing this inconsistency in user permissions between Project Server and SharePoint.According to the description of this group, it says "users who have...
View ArticleProject Workspace Auto permissions provisioning
Have Project Server 2010 in a SharePoint 2010 farm. Have custom EPT with custom site template.Have custom groups with custom permissions and custom categories assigned.Want to have permissions assigned...
View ArticleProject client over WAN
We have an old customer that we due to capability problems upgraded from MS Project Server 2003 to PS2010 last year. The customer was shortly after acquired by a large company and their IT...
View ArticleExpected version of the product was not found on the system.
Hi,I am in the process of applying PS2010 SP1 and it gives me this error: "Expected version of the product was not found on the system". I already have SP2010 SP1 installed with Project Server 2010...
View ArticleHow can I customize the opened plan view in the top of PWA Quick Launch area
When I open a project plan in Project center in PWA, there will display a new created view on the top of Quich Launch for the opened project plan, and there always have only two links of "Schedule" and...
View ArticleExpected version of the product was not found on the system. Project Server...
Hi!I am in the process of applying PS2010 SP1 and it gives me this error: "Expected version of the product was not found on the system". I already have SP2010 SP1 installed as the client already had...
View ArticleProject Server 2010 - Baseline RAG Status in PWA
IIf([Baseline Finish] = ProjDateValue("NA"), "No Baseline",IIf([Actual Finish] <> ProjDateValue("NA") And [Actual Finish] > [Baseline Finish], "Delivered Late", IIf([Finish] > [Baseline...
View ArticleProject Server 2013 Virtual Machine for test?
Hello,Is there any Project Server 2013 Virtual Machine for test as for 2010?Thanks
View ArticleProject Server 2013 virtual machine ?
Hello,Could you tell me if Microsoft proposes for downloading a VM with Project Server2013 Preview (for demo and test)Thanks
View ArticleIssue on Approval Center page after installing ProjectServer 2010 April CU 2013
We had installed ProjectServer 2010 April CU 2013 in couple of our non-prod environments single server environment and load balancer (multi server environment), after installing CU we are noticing...
View ArticleMS Project hangs when creating a new project using an Enterprise project...
Hello all, I have the following problem for several EPM customers.1. In Project Professional 2010, can you click File > New > Project Server Templates (in the top row), in the dialogue box click...
View ArticlePS2010 - user CANNOT open project schedule to edit (always says "checked out")
Well here I am with another mysterious quandary.A couple of users cannot edit their project schedule. As soon as they select and Open in MS Project Professional to edit, they get the message that the...
View ArticleProject Server 2010: assigning a user to a summary task
I used Project Professional 2010 to assign a user (Joe) to a summary task. When Joe logs in, he sees the summary task in his My Tasks area as expected. Have a couple of questions:1.) Is there a way...
View ArticleProject Server Schedule not updating once Projects are checked back in
On my Project 2013 server, I open the project file (in Project Pro), add tasks and check back in. The updates are not reflected on the project server, although they will be there next time I open the...