Hi All,
Is it possible to achieve the below in project server 2013, please provide me if there is any reference link.
1. Is possible to bulk upload the business drivers from excel. or through PSI
2. Automatically create the project code when the project is created.
3. Proggramatically configure the delegates. The delegation will be available in CRM, need to retrieve and set in EPM programatically.
4. Is it possible to fill the word template fields which is uploaded in the project workspace with the data retrieved from Project PDP. i.e. The project related document will be uploaded to the project workspace. The documents which will have some like project name, project code, project manager. This information need to be filled by the data retrieved from the project information PDP which is already filled by PM.
Thanks in advance
Thanks in advance, Taj